Navigation auf uzh.ch
The unplugging of equipment from the Central IT is not permitted under any circumstances.
Since the buildings are dimensioned for optimum coverage and the access points are positioned accordingly, the interruption has a direct impact on the entire environment or the building.
If WLAN is not desired in the affected area, smaller buildings are completely dismantled, while medium-sized buildings are dismantled in sections - WLAN is not dismantled to access point level.